Development of the research project "Development of a power balancing system for small HPPs " - 1st quarter (01.07.2025 - 31.10.2025)

The first quarter of the project has ended (01.07.2025 - 31.10.2025).

1 activity was completed at this stage:

"Exploring existing solutions"

This activity conducted a comprehensive study of existing energy balancing solutions used in small hydropower plants and other similar renewable energy sources. Technologies, algorithms, energy storage methods and control strategies were analyzed. As a result of the activity, a technical requirements specification was developed.

Project identification number: 2.2.1.3.i.0/2/24/A/CFLA/001