The third quarter of the project has ended (01.02.2026 - 30.04.2026).
2 activities were completed at this stage:
"System Architecture Research and Development"
In this activity, the high-level architecture of the smart energy management system was developed, the functional parts of the system, data flows and connection logic between the HPP, the battery system and the power balancing system were determined.
"Development of a balancing control system - alpha stage"
In this activity, the first functional prototype (alpha version) of a control algorithm was developed and tested, which controls the generation, storage and supply of electricity to the grid depending on the specified parameters.
Project identification number: 2.2.1.3.i.0/2/24/A/CFLA/001